• Brazil: Feasibility Study: Amazonas State Data Center Design
    Activity Number: 2014-51031A
    Activity Type: Feasibility Study
    Carlos Tavares
    TechXact Group Corporation
    (301) 337-0187
    Director, Latin America
    Approval Date: 12/17/2015
  • India: Integrated Wind, Solar and Energy Storage Project
    Activity Number: 2015-31004A
    Activity Type: Feasibility Study
    Denise Benoit
    General Electric International, Inc.
    (518) 385-0901
    Senior Contract Manager, GE Energy Consulting
    Approval Date: 12/15/2015
  • Senegal: Bargny-Sendou Bulk Port
    Activity Number: 2015-11029A
    Activity Type: Feasibility Study
    Marcel Veilleux
    Cardno GS, Inc.
    (410) 990-0299
    Principal
    Approval Date: 12/04/2015
  • Brazil: Feasibility Study: CAGECE Tertiary Wastewater Treatment Plants/Aut. Water & Sewage Cont. Syst. Proj.
    Activity Number: 2012-51013A
    Activity Type: Feasibility Study
    William Pfrang
    AECOM Technical Services, Inc.
    (212) 984-7366
    Project Manager
    Approval Date: 12/01/2015
  • Turkey: Advanced Smart Grid Applications for Power Distribution
    Activity Number: 2014-21023A
    Activity Type: Technical Assistance Study
    Dean White
    Tetra Tech ES Inc.
    (703) 387-2156
    President
    Approval Date: 11/05/2015
  • China: Feasibility Study: Big Data Management System FS and Pilot Project
    Activity Number: 2015-61019A
    Activity Type: Feasibility Study
    Joyce Lee
    Clear Innovative Technology Solutions, LLC
    (202) 258-9430
    Principal
    Approval Date: 10/21/2015
  • Nigeria: ABIBA Solar Independent Power Plant
    Activity Number: 2015-11019A
    Activity Type: Technical Assistance Study
    Dean White
    Tetra Tech ES, Inc.
    (703) 387-2156
    President
    Approval Date: 10/15/2015
  • Tanzania: Lake Victoria Islands Minigrid Pilot Project
    Activity Number: 2015-11028A
    Activity Type: Technical Assistance Study
    Rod A Ekern AIA PE
    Water Wheel International, Inc. (WWI)
    (817) 784-3066
    President
    Approval Date: 09/11/2015
  • Turkey: Second Stage Smart Grid Implementation for Power Distribution
    Activity Number: 2015-21001A
    Activity Type: Technical Assistance Study
    Nader Farah
    ESTA International, LLC
    (703) 579-1944
    President
    Approval Date: 09/10/2015
  • Malawi: Luweya Hydropower Plant
    Activity Number: 015-11014A
    Activity Type: Technical Assistance Study
    Sayan Chakraborti
    MRIGlobal
    (816) 326-5092
    Senior Program Manager
    Approval Date: 09/10/2015