• October 19, 2017

    Background: Platinum Power, a Power Africa partner, has pre-qualified a total of 6 consortia for the design and construction of their hydropower projects in Côte d’Ivoire. These include the hydropower plant of Gao, with...

  • October 19, 2017

    Background: Platinum Power, a Power Africa partner, has pre-qualified a total of 7 consortia for the design and build of one of their hydropower projects in Cameroon, the Makay Hydroelectric project. This project has an...

  • October 06, 2017

    Background: Ethiopian Electric Power (EEP) is calling for pre-qualification bids for the deployment of two 125 MW solar photovoltaic power plants under the World Bank’s Scaling Solar program. The tender will pre-qualify...

  • October 06, 2017

    Background: The Ministry of Water, Energy and Hydrocarbons (MEEH) issued a Request for Pre-Qualification bids for the design, financing, construction, commissioning, and operation of a 25 MW solar photovoltaic project...